You are here:
change given): Turn left into road "Leobener Straße", a few hundred meters behind the huge microgravity tower. After hundred meters the car park entrance is on your left. After parking, pass the "Ener
Section: FB5
get off at the Lise-Meitner-Straße stop. Follow the tracks in the direction of travel (approx. 200 meters) and turn right into Enrique-Schmidt-Straße. The second building on the right is the WIWI2 building
Section: FB7
150 square meter floor space (not including the inner courtyard) the university's main rental space including the cafeteria and the former banking hall encompasses around 13,460 square meters. The adjacent [...] adjacent areas are spread across three floors and total around 4,690 square meters. Constructed in 2016, the building was formerly used by NordLB. © Felix Clebowski / Universität Bremen Experience Science [...] literature. Foresight was crucial for planning the secure mounting of the bookcases. Per square meter, completely full bookcases bear a load of 1.2 tons. Fixtures were installed directly into the concrete
Section: University
award in Germany. He learned about the prize during a meeting with colleagues at the top of the 146-meter-high drop tower. © Universität Bremen/GfG Lutz Mädler Professor for Mechanical Process Engineering
Section: Sites
senior citizens who can offer a room and students willing to work to live there: For each square meter the students inhabit free of charge, they work one hour around the house or garden, on the computer
at the next traffic light following Universitätsallee. * After 270 meters, take the left-hand bend to Achterstraße. * After 80 meters turn right into the entrance and drive straight ahead onto the parking [...] * Get off at the stop "Berufsbildungswerk / Technologiepark". * From there, walk back about 260 meters in the opposite direction and cross the bridge over the "Kleine Wümme". * Immediately after the bridge
Section: FB3
bringing it to life will be completed by the time we hold our next network meeting. About 22,000 square meters of gross floor area will be home to office spaces, lab areas, and a technical center for about 500
questions. The second team turned to the area of Robotics in a different section of the 500-square-meter ‘playing field’ and learned about the demands from package robots that can unload containers completely
__blob=publicationFile&v=12 ) J. Bergner, B. Siegel, D. Beier, V. Quaschning, N. Pflugradt, T. Boström, „Metering Solar Energy for Rental Flats“, 7. Solar Integration Workshop, Berlin, 10/2017. B. Siegel, J. Bergner
Section: FB4
die Entwicklung digitaler Mehrwertdienste für die kommunale Wohnungswirtschaft auf Basis des Smart Meter Gateways (SMGW). Außerdem werden in den Querschnittsaktivitäten zum einen IT-gestützte Plattformen