The University of Bremen conducts research, teaching, and knowledge transfer at the highest level – work that requires spaces equal to those high standards. The Bremen Senate recently granted the university 35 million euros on short notice, drawn from Bremen's share of the federal government's special infrastructure fund, to modernize its science buildings and equipment.
As they toured the campus, President Jutta Günther and Director of Finance and Administration Frauke Meyer emphasized how crucial this support from the State of Bremen is to the university's development in the years ahead. With the decision on Germany's Excellence Strategy coming up on October 2, the mayor was especially keen to show his support. Bovenschulte confirmed that the state stands fully behind the university and its joint application with the University of Oldenburg.
The visit took in several sites that illustrate what has already been achieved in new construction and renovation – and what lies ahead. In addition to the 35 million euros for the University of Bremen, another 10 million euros have been earmarked for a new building for the Leibniz Centre for Tropical Marine Research.
Andreas Bovenschulte: "Forty-five million euros for science – that's a concrete investment in the future of our research region. The University of Bremen plays a key role in this. Especially with the Excellence Strategy in mind, we want to show that Bremen stands for world-class research and teaching and that this requires strong framework conditions."
Jutta Günther: "We've already accomplished a great deal in recent years: BIOM, our modern research and teaching building for biology; the Center for Deep-Sea Research, an extension of MARUM; and the move into our downtown building, home to the Faculty of Law. Now we're continuing to upgrade our campus buildings with NW2 – it's fantastic. After that, we'll turn to the infrastructure for a sustainable power and energy supply. It's a major undertaking that only works if we do it together, step by step."
Upcoming Renovations
The NW2 Block A renovation project involves a comprehensive overhaul of the Natural Sciences II (NW2) building complex on the University of Bremen campus.
NW2 was built in 1975 for the chemistry and biology departments (Faculty 2) and consists of two nearly identical blocks, A and B. As a cost-effective renovation that preserved the existing structure was no longer practical, the university decided on a fundamental modernization instead. All of the university's major buildings and infrastructure dating back to its founding years in the 1970s are now due for renovation.
New Power Supply Center: A Key Project for Bremen Senate in Coming Years
Here, too, the need for renovation is obvious as the facility on campus dates back to 1972. Three subprojects are planned: repairing the existing Power Supply Center, renovating the campus's pipeline and cabling infrastructure, and building a second Power Supply Center as a backup. In the medium term, this second facility could also supply power to the southern Technology Park.

